about-banner-image
cnc-image

Supervision and implementation follow-up services are considered one of the important steps to ensure that the works are executed at the highest quality in accordance with the project specifications and in line with the project’s time schedule.

The office provides permanent and periodic supervision services and follow-up implementation in proportion to the project entrusted to it and this includes preparing and implementing a plan for supervision that includes following up the schedule. Moreover, monitoring the works that are being implemented and ensuring that they conform to the specifications while providing solutions to problems that may result during implementation.

Our services in this field include the following:

  • Receiving the backfill layers and foundation layers, the tooth layers and the tooth treated with cement dust, and conducting the validity tests for them according to the specifications of the Egyptian Road Code. Such as tests of gradation, fluidity and state, determination of the maximum dry density in the laboratory, Los Angeles, friability and absorption rates, California tolerance ratio, field compaction ratio.
  • Receipt of the impregnation layer, the bonding asphalt layer, the adhesive layer and the surface asphalt layer. As well as conducting laboratory tests on asphalt mixtures such as stability tests, extraction. Along with field tests such as monitoring the temperature of the asphalt mixture before brushing, monitoring the rates of spraying the impregnation layer and the adhesive layer, taking samples from the asphalt layers after the brushing to ensure the thickness of the layer as well as the proportion of compaction.
  • Receipt of paving works from road side slopes, New Jersey pouring works and drainage ditches rain water and taking concrete cubes to ensure that the required effort is achieved according to the project specifications and supervising the implementation of the floor markings and ensuring that the road paints conform to the specifications in terms of the degree of reflection and thickness of the paints
  • Supervising the implementation of the floor markings and ensuring that the road paints conform to the specifications in terms of the degree of reflection and thickness of the paints
  • Preparing contractual documents that deal with quality requirements
  • Auditing the working drawings of the project to ensure that they do not violate the specifications
  • Putting any notes on the working drawings with the aim of referring to the designer consultant
  • Calculate the required work quantities
  • Choosing the appropriate sources of construction materials in order to achieve the limits of specifications
  • Conducting viability tests of construction materials
  • Refusal or approval of works in accordance with project specifications and requirements
  • Checking the quality of the equipment used to implement the project.
  • Supervision of crushers to recycle existing asphalt layers
  • Supervising the mixers and ensuring that the mixing ratios match the design mix specifications.
  • Follow-up the progress of work in accordance with the timetable and take the necessary measures in case of delays in the implementation of the work.
  • Preparing, auditing extracts and submit them to the owner.
  • Doing the work of the technical office
  • Providing technical advice during implementation to ensure the quality of work
  • Preparing and submitting periodic project reports

Have you any question or query

GET FREE CONSULTATION WITH OUR AGENT

Request A Quote

Contact us

  • 5 T Al-Moez Li Din Allah Street,
    Ard Al-Golf, Cairo
  • (+02) 012-2813-7657
  • Info@Dr-Khaled-Kandil.com