2020-12-01
2021-12-30
1,580,000,000 Week
The first phase, the eastern direction (from Beni Suef to Al-Karimiat), From Beni Suef Tunnel to Al-Karimiat Gate, with a length of 37 km and a width of 23.60 m (3 main asphalt lanes + 2 service concrete lanes).